Thu Dec 31, 2015 9:14 am
Thu Dec 31, 2015 9:21 am
Thu Dec 31, 2015 9:27 am
Bakedalasker wrote:It has deteriorated over the last season and it looks like a problem pitch to play on.
The mud patches in some areas are embarrassing and the club needs to address this. I know we are having cut backs but if this is part of it then the club needs to look elsewhere.
Thu Dec 31, 2015 9:30 am
Thu Dec 31, 2015 9:46 am
Thu Dec 31, 2015 10:00 am
Thu Dec 31, 2015 10:02 am
Thu Dec 31, 2015 10:05 am
Thu Dec 31, 2015 10:06 am
sam1991 wrote:The pitch is usually taken up and relayed every November. This year it hasnt
Thu Dec 31, 2015 10:07 am
Thu Dec 31, 2015 10:39 am
Thu Dec 31, 2015 10:44 am
Nemo wrote:According to Nathan Blake on his Boot Room show they didn't' do the necessary work in the summer. I think they have said that the late Wales match prevented it but I don't believe that. Looks like cost cutting to me.
Thu Dec 31, 2015 10:44 am
Forever Blue wrote:The Pitch has been awful for months
What on earth is wrong with the pitch at the Cardiff City Stadium?
By Steve Tucker
31/12/15
The surface looked dreadful, cutting up at every step and with large patches of mud. Even down the flanks the condition was very poor.
The playing surface in the Welsh capital used to be second to none. The club has invested on lights to treat the pitch after games, but right now it looks an awful mess. A number of opposition mangers have already commented on it recently.
It is hardly as if the weather has been terrible this winter so far, it has been pretty mild in fact. OK, there has been some rain, but surely not enough to make surface as bad as it is. People complain about the Bluebirds not indulging in the passing game enough, but what can you do on a surface like that?
Thu Dec 31, 2015 10:46 am
Forever Blue wrote:Bakedalasker wrote:It has deteriorated over the last season and it looks like a problem pitch to play on.
The mud patches in some areas are embarrassing and the club needs to address this. I know we are having cut backs but if this is part of it then the club needs to look elsewhere.
In my opinion cut backs.
Some on here said don't be daft, its the rain, well MK Dons was perfect and all the other Championship clubs pitches have been good.
Thu Dec 31, 2015 10:52 am
Thu Dec 31, 2015 10:56 am
wez1927 wrote:Forever Blue wrote:Bakedalasker wrote:It has deteriorated over the last season and it looks like a problem pitch to play on.
The mud patches in some areas are embarrassing and the club needs to address this. I know we are having cut backs but if this is part of it then the club needs to look elsewhere.
In my opinion cut backs.
Some on here said don't be daft, its the rain, well MK Dons was perfect and all the other Championship clubs pitches have been good.
Cut backs lol that old chestnut lol
Thu Dec 31, 2015 11:11 am
pembroke allan wrote:wez1927 wrote:Forever Blue wrote:Bakedalasker wrote:It has deteriorated over the last season and it looks like a problem pitch to play on.
The mud patches in some areas are embarrassing and the club needs to address this. I know we are having cut backs but if this is part of it then the club needs to look elsewhere.
In my opinion cut backs.
Some on here said don't be daft, its the rain, well MK Dons was perfect and all the other Championship clubs pitches have been good.
Cut backs lol that old chestnut lol
Well several people have given the explanation so that's end to another negative thread!!
" Several other clubs have a bad pitch.
Thu Dec 31, 2015 11:23 am
Bridgwater Blue wrote:Annis, I spoke to the head groundsman before the game about the quality of the pitch. He is frustrated because it is as a result of not being able to completely remove the surface in the summer due to the Wales games. This summer apparently there are a couple of concerts early on and then they are going to completely renew the surface.
Good to see you again in the Sand Martin
Thu Dec 31, 2015 11:24 am
bluebird58 wrote:Why hasn't anyone blamed Slade yet?
Thu Dec 31, 2015 11:46 am
its tans fault for letting Wales use the stadium and he's made the weather badForever Blue wrote:bluebird58 wrote:Why hasn't anyone blamed Slade yet?
That will be Slades next excuse
Thu Dec 31, 2015 1:36 pm
Leytonstoneblue wrote:Nemo wrote:According to Nathan Blake on his Boot Room show they didn't' do the necessary work in the summer. I think they have said that the late Wales match prevented it but I don't believe that. Looks like cost cutting to me.
Typical of the negative attitude that has been peddled by the mouthy minority on here, you would prefer to blame cost cutting and ignore the fact that the pitch was used for extra games in the summer for the first time and the pitch hasn't had its usual recovery time. Another opportunity to blame Tan for something he has no involvement in
Thu Dec 31, 2015 1:50 pm
wez1927 wrote:Forever Blue wrote:Bakedalasker wrote:It has deteriorated over the last season and it looks like a problem pitch to play on.
The mud patches in some areas are embarrassing and the club needs to address this. I know we are having cut backs but if this is part of it then the club needs to look elsewhere.
In my opinion cut backs.
Some on here said don't be daft, its the rain, well MK Dons was perfect and all the other Championship clubs pitches have been good.
Cut backs lol that old chestnut lol
Thu Dec 31, 2015 1:52 pm
Thu Dec 31, 2015 1:53 pm
wez1927 wrote:its tans fault for letting Wales use the stadium and he's made the weather badForever Blue wrote:bluebird58 wrote:Why hasn't anyone blamed Slade yet?
That will be Slades next excuse
Thu Dec 31, 2015 2:40 pm
Thu Dec 31, 2015 3:08 pm
Forever Blue wrote:wez1927 wrote:its tans fault for letting Wales use the stadium and he's made the weather badForever Blue wrote:bluebird58 wrote:Why hasn't anyone blamed Slade yet?
That will be Slades next excuse
Serious Wez![]()
![]()
Thu Dec 31, 2015 3:44 pm
Thu Dec 31, 2015 7:35 pm
Nemo wrote:Leytonstoneblue wrote:Nemo wrote:According to Nathan Blake on his Boot Room show they didn't' do the necessary work in the summer. I think they have said that the late Wales match prevented it but I don't believe that. Looks like cost cutting to me.
Typical of the negative attitude that has been peddled by the mouthy minority on here, you would prefer to blame cost cutting and ignore the fact that the pitch was used for extra games in the summer for the first time and the pitch hasn't had its usual recovery time. Another opportunity to blame Tan for something he has no involvement in
I did not post to be negative but to provide a possible explanation for the state of the pitch.. Unlike many on here I am not violently anti- Tan and fully support the long overdue cost cutting that is going on. It should have happened in the summer after our relegation.
But it would be interesting if someone could explain why the Bon Jovi concert on 12th June 2013 didn't prevent the preparation of a good pitch for the next season while the Wales game on 12th June 2015 seemingly did. There may well be a logical explanation but I know nothing about pitch preparation and have no idea what it might be.